Infantry Drills

H-75: Reduce a Constructed Obstacle



Previous: H-73: Marking and Crossing the Minefield

H-75. Reduction methods for enemy wire and tank ditch obstacles are as follows.

Next: H-76: Reduce a Wire Obstacle

Go Back To: U.S. Army FM 3-21.8: The Infantry Rifle Platoon and Squad